Lead times
and export delivery.

What happens after you ask for a price, laid out plainly: five stages, each with something we hand over and something you confirm.

  1. 01
    Reviewing drawings with the customer

    Requirements

    Drawings, material, quantity and date reviewed before anything else: whether we can make it, how, and what we would change.

    Handover

    Feasibility note · Quotation

  2. 02
    Process planning at the CAD workstation

    Process review

    Routing, workholding and key operations fixed; gauges and inspection points listed, acceptance criteria written into the review.

    Handover

    Routing sheet · First-article plan

  3. 03
    Large ring gear after heat treatment

    Production

    Rough machining, heat treatment and finishing scheduled in sequence, with photo records at key stages and progress on request.

    Handover

    Traveler · Stage records

  4. 04
    Ultrasonic inspection of a forged shaft

    Inspection

    Dimensions and geometric tolerances checked to drawing; UT, hardness or tensile retests on material. Nothing ships if it fails.

    Handover

    Inspection report · Material cert

  5. 05
    Containers and trucks ready for shipment

    Packing & shipping

    Rust protection, bracing and shipping marks for the destination; FCL, LCL or out-of-gauge, shipped the way you specify.

    Handover

    Packing list · Shipping documents

Quotation

A complete drawing set is enough to evaluate; where something is missing we confirm by mail or phone first.

First article

A first-article record before the batch, with a sample part when you want one.

Documents

Packing list, material certificate, inspection report; English versions for export orders.

Freight

FCL, LCL or out-of-gauge, quoted to your port and trade term.